Workshop

Workshop on flexible access (GUFlex)

Agenda 15 novembre 2024

  1. Introduction

  2. Updates on design presented in previous workshops
  3. Revaluation of flexibility: updated process
  4. EOS/EDS technical report
  5. Grid Connection Study methodology: status

  6. Additional evolutions foreseen as a next step
  7. The impact on the BSP and CRM
  8. Management of mixed sites
  9. Specific needs of demand facilities

  10. Long-term solution
    Target Model
  11. Optimized approach considering flexibility, from grid planning to operation
  12. Enablers
  13. Optimization of flexibility activations in operations
  14. Definition of a consistent set of Congestion Management Products
  15. Remuneration model
  16. Methodological developments required in long-term grid planning
  17. Roadmap - main principles
  18. Conclusions and next steps
Ce site web utilise des cookies pour optimaliser votre expérience de navigation. Certains de ces cookies sont strictement nécessaires pour garantir le fonctionnement de ce site web et ne peuvent pas être refusés. D’autres sont utilisés à des fins d’analyse/de fonctionnalité/de ciblage et peuvent être refusés. Pour plus d’informations, vous pouvez consulter notre Politique en matière de cookies . Vous pouvez gérer/modifier vos préférences en matière de cookies à tout moment. Si vous ne gérez pas vos préférences en matière de cookies, seuls les cookies strictement nécessaires seront acceptés.