Workshop
Workshop on flexible access (GUFlex)
Agenda 15 november 2024
- Introduction
- Revaluation of flexibility: updated process
- EOS/EDS technical report
- Grid Connection Study methodology: status
- The impact on the BSP and CRM
- Management of mixed sites
- Specific needs of demand facilities
- Optimized approach considering flexibility, from grid planning to operation Enablers
- Optimization of flexibility activations in operations
- Definition of a consistent set of Congestion Management Products
- Remuneration model
- Methodological developments required in long-term grid planning
- Roadmap - main principles
- Conclusions and next steps
Updates on design presented in previous workshops
Additional evolutions foreseen as a next step
Long-term solution
Target Model