Pour se conformer aux Codes de Réseau européens (EU Network Codes), Elia est obligé de publier les modalités et conditions ou méthodologies (non-confidentiels) qui ont été établis dans le cadres des Network Codes et ont été approuvés par les autorités de régulation compétentes (ou si aucune approbation n’est requise, de les publier dès qu’ils ont été établis). Ces modalités et conditions ou méthodologies sont listés ci-dessous, structurés par Network Code. Pour plus d’informations sur la mise en œuvre des Network Codes, voir ci-dessous.
Codes de raccordement:
-
Requirements for Generators (RfG)
-
Demand Connection Code (DCC)
-
High Voltage Direct Current Connections (HVDC)
Codes marché:
-
Capacity Allocation & Congestion Management (CACM)
-
Forward Capacity Allocation (FCA)
-
Electricity Balancing (EB)
Sujet | Date de décision | Documents |
Methodology for a list of standard products for balancing capacity |
17 June 2020 |
ACER Decision: 11-2020 on the Methodology for a list of standard products for balancing capacity |
Methodology for a co-optimised allocation process of cross-zonal capacity |
17 June 2020 |
Annex I: Methodology for co-optimised allocation process of cross-zonal capacity |
Methodology for classifying the activation purposes of balancing energy bids |
15 July 2020 |
Annex I: Methodology for classifying the activation purposes of balancing energy bids |
Common settlement rules applicable to all intended exchanges of energy as a result of the reserve replacement process, the frequency restoration process with manual and automatic activation and the imbalance netting process |
15 July 2020 |
|
Harmonisation of the main features of imbalance settlement |
15 July 2020 |
ACER Decision: 17-2020 on the Harmonisation of the main features of imbalance settlement Annex I: Harmonisation of the main features of imbalance settlement |
All asynchronously connected TSOs’ proposal for Common settlement rules for all intended exchanges of energy between synchronous areas as a result of the frequency containment process and of ramping restrictions |
27 May 2020 | All asynchronously connected TSOs’ proposal for Common settlement rules for all intended exchanges of energy between synchronous areas as a result of the frequency containment process and of ramping restrictions |
All continental European TSOs’ proposal for Common settlement rules for intended exchanges of energy as a result of the frequency containment process and ramping period |
11 June 2020 | All continental European TSOs’ proposal for Common settlement rules for intended exchanges of energy as a result of the frequency containment process and ramping period |
All continental European TSOs’ proposal for Common settlement rules for all unintended exchanges of energy |
11 June 2020 | All continental European TSOs’ proposal for Common settlement rules for all unintended exchanges of energy |
Implementation Framework for a European platform for the imbalance netting process |
24 June 2020 | |
Implementation framework for a European platform for the exchange of balancing energy from frequency restoration reserves with manual activation | 24 January 2020 |
Acer Decision: 03-2020 on the Implementation framework for mFRR Platform Annex I: Implementation framework for mFRR Platform Annex II: Evaluation of responses to the NRAs and TSOs consultation on the mFRR |
Implementation framework for a European platform for the exchange of balancing energy from frequency restoration reserves with automatic activation | 24 January 2020 |
ACER Decision: 02-2020 on the Implementation framework for aFRR Platform Annex I: Implementation framework for aFRR Platform Annex II: Evaluation of responses to the NRAs and TSOs consultation on the aFRR |
Methodology to determine prices for the balancing energy that results from the activation of balancing energy bids for the frequency restoration process | 25 February 2022 |
ACER Decision: 03-2022 on Amendment on the Methodology for pricing balancing energy ACER Decision: 01-2020 on the Methodology for pricing balancing energy Annex I: Methodology for pricing balancing energy Annex II: Evaluation of responses to the NRAs and TSOs consultation on the Pricing Proposal |
All asynchronously connected TSOs’ proposal for Common settlement rules for all unintended exchanges of energy between synchronous areas | 9 January 2020 | All asynchronously connected TSOs’ proposal for Common settlement rules for all unintended exchanges of energy between synchronous areas |
Common and harmonised rules and processes for the exchange and procurement of FCR | 18 December 2018 | All TSOs proposal for article 33(1) of EBGL |
Exemption from the obligation to allow balancing service providers to transfer their obligations to provide FCR | 18 December 2018 | All TSOs proposal for article 34(1) of EBGL |
Exemption from the requirement to carry out the procurement of upward and downward balancing capacity of aFRR separately | 18 December 2018 | Proposal for exemption according to article 32(3) of EBGL |
Codes opérationnels:
-
System Operation Guideline (SO GL)
Sujet | Date de la décision | Documents |
FCR additional properties | 21 January 2021 | The Additional Properties of FCR in accordance with article 154(2) of SOGL |
Key Organisational Requirements, Roles and Responsibilities (KORRR) relating to Data Exchange | 19 December 2018 | ACER Decision All TSOs’ proposal for the KORRR relating to Data Exchange Supporting document |
Common Grid Model Methodology | 17 September 2018 | All TSOs’ proposal for a common grid model methodology |
-
Emergency & Restoration (E&R)
Topic |
Decision date | Documents |
Elia Market Suspension Rules, Market Restoration Rules and Rules for Imbalance settlement in case of suspension of market activities | 9 November 2023 | Règles de suspension et de rétablissement des activités de marché, conformément à l’article 36(1) et de Règles régissant le règlement des déséquilibres de l’énergie d’équilibrage en cas de suspension des activités de marché, conformément à l’article 39(1) du Règlement 2017/2196 de la Commission du 24 novembre 2017 établissant un code de réseau sur l'état d'urgence et la reconstitution du réseau électrique |