Samples to be taken between late November and the end of the year
In connection with the underground line project between the Ciply and Pâturages substations, various samples must be taken and probes carried out on the territory of the municipalities i
This activity is independent of the permit application procedure currently underway and does not in any way constitute the start of work.
The aim is to supplement the technical information already in Elia's possession by:
- checking the location of utilities on-site
- taking soil samples that will be analysed:
- for the soil quality report (Walterre)
- in order to technically prepare the site on the basis of the type of soil found there
If local residents have any questions or comments, the Elia team can be contacted on our toll-free number (0800 18 002) or by e-mail (riverains@elia.be).