29 September 2023
Elia rolls out second stage of East Loop
Elia, the Belgian power grid operator, rolled out stage two of the East Loop project this Friday 29 September in the presence of Walloon Energy Minister Philippe Henry.
29 September 2023
Elia, the Belgian power grid operator, rolled out stage two of the East Loop project this Friday 29 September in the presence of Walloon Energy Minister Philippe Henry.