Public consultations
As the operator of Belgium’s transmission system, Elia regularly consults Belgian market parties and the general public.
Stakeholder involvement
Elia sets great store by input, responses and feedback from the Belgian market parties and the general public, which is why we regularly consult both groups as part of our work as the operator of the Belgian electricity transmission system.
We gather their views at an early stage in the design process, with consultation topics including market processes, products, design notes and regulated contracts, whether new or undergoing revision.
This page provides information about all the public consultations launched by Elia from 2018 onwards. It features an overview of ongoing and closed public consultations.
Ongoing consultations
There is no public consultation actually ongoing
-
22 November 2024 - 20 December 2024
Formal public consultation on the CRM Functioning Rules
-
05 November 2024 - 05 December 2024
Public consultation on the methodology, the basis data and scenarios used for the study regarding the adequacy and flexibility needs of the Belgian power system for the period 2026-2036
Closed consultations
There is currently no closed public consultations for 2022
-
15 October 2024 - 19 November 2024
Public consultation on the “Adaptation plan for the Walloon Region 2025-2035”
-
18 October 2024 - 18 November 2024
Public consultation on the Proposal for Amendment to the T&C BSP FCR
-
11 October 2024 - 11 November 2024
Public consultation on the revision of the FCR and aFRR Energy Management Strategies requirements for Delivery Points with Limited Energy Reservoirs
-
22 October 2024 - 11 November 2024
Public consultation on availability testing in the market and articles for the introduction of smart testing in the T&C mfrr
-
27 September 2024 - 27 October 2024
Public consultation regarding the revision of the Access Contract
-
20 September 2024 - 18 October 2024
Public consultation on the modifications to the Terms & Conditions for Balance Responsible Parties (T&C BRP)
-
05 September 2024 - 08 October 2024
Public consultation on the proposal of exemption from the obligation to procure upward and downward balancing capacity for aFRR separately
-
30 August 2024 - 27 September 2024
Public consultation on the analysis on faster BRP settlement and impact on the BRP financial guarantee
-
31 May 2024 - 05 July 2024
Connection with flexible access: Design note on the evolution of the framework at federal level
-
31 May 2024 - 01 July 2024
Public consultation on the proposal of review of the Terms and Conditions applicable to providers of restoration service (T&C RSP)
-
07 June 2024 - 24 June 2024
Public consultation on a proposal for modification of the tariff for maintaining and restoring the residual balance of individual BRPs
-
21 May 2024 - 21 June 2024
Public consultation on Elia's test plan
-
12 April 2024 - 13 May 2024
Public consultation on the scenarios, sensitivities and data for the CRM parameter calculation for the Y-1 Auction for Delivery Period 2026-2027, the Y-2 Auction for Delivery Period 2027-28 and the Y-4 Auction for Delivery Period 2029-2030
-
02 April 2024 - 30 April 2024
Formal public consultation on the CRM Capacity Contract
-
29 March 2024 - 29 April 2024
Public consultation on the Proposal for Amendment to the Balancing Rules in the context of the connection to the aFRR Platform
-
28 February 2024 - 29 March 2024
Public consultation on the Proposal for Amendment to the T&C BSP aFRR
-
23 February 2024 - 25 March 2024
Public consultation on the proposal for Procurement Procedures for Reactive Power Services
-
23 February 2024 - 25 March 2024
Public consultation on the proposal of review of the Terms and Conditions applicable to providers of restoration service (T&C RSP) and Procurement process for Restoration Services
-
20 December 2023 - 16 February 2024
Public consultation regarding the revision of the Connection contract
-
22 December 2023 - 11 February 2024
Public Consultation on the Design Note Real-Time Price (RTP)
-
20 November 2023 - 22 January 2024
Public consultation Task Force Princess Elisabeth Zone
-
01 December 2023 - 12 January 2024
Formal public consultation on the CRM Functioning Rules
-
06 November 2023 - 04 December 2023
Cost-Benefit analysis on requirements for generators applicable on existing and new generating units between 1 and 25 MW
-
25 October 2023 - 24 November 2023
Public Consultation on the Design Note Direct Market Access (DiMaX)
-
13 October 2023 - 14 November 2023
Adaptation plan for the Walloon Region 2024-2034
-
28 September 2023 - 30 October 2023
Public consultation on the voltage service and reactive power control review and recommendations for design optimisations in the framework of a CREG incentive
-
22 September 2023 - 23 October 2023
Public consultation on the prequalification, control, and penalties for the aFRR and mFRR services in the framework of a CREG incentive
-
01 September 2023 - 02 October 2023
Public consultation on the prediction of “deterministic frequency deviation” (DFD) and the contribution of Elia in the framework of a CREG incentive
-
14 July 2023 - 18 September 2023
Public consultation on the design note related to connections with flexible access on the federal transmission grid
-
18 August 2023 - 15 September 2023
Public consultation on a modification of Elia’s LFC block operation agreement and the methodology to determine the balancing capacity in the Elia LFC block
-
07 July 2023 - 31 August 2023
Public consultation of the study on the BRP perimeter adjustments applied in case of the activation of mFRR or redispatch energy bids
-
05 July 2023 - 30 August 2023
Public consultation on the T&C BSP mFRR in the framework of the MARI project as well as on the Balancing Rules in the framework of the MARI and PICASSO projects and of the transfer towards the T&C BRP of the provisions regarding the imbalance tariff
-
06 June 2023 - 28 August 2023
Public Consultation on the Terms and Conditions for the Outage Planning Agent (T&C OPA), Terms and Conditions for the Scheduling Agent (T&C SA) and the Rules for Coordination and Congestion Management in the framework of the phase 1 of iCAROS project as well as the planning of the implementation of the scope of iCAROS phase 2
-
12 July 2023 - 28 August 2023
Public consultation on the proposal of amendment of the T&C BRP
-
16 June 2023 - 25 July 2023
Public consultation CDC 3.0
-
24 May 2023 - 25 June 2023
Public consultation on the proposal of amendment of the T&C BSP aFRR
-
21 April 2023 - 02 June 2023
Public Consultation on Flexibility documents
-
18 April 2023 - 19 May 2023
Public consultation on the scenarios, sensitivities and data for the CRM parameter calculation for the Y-1 Auction for Delivery Period 2025-2026 and the Y-4 Auction for Delivery Period 2028-2029
-
17 April 2023 - 17 May 2023
Development plan for the Brussels-Capital Region 2024-2034
-
07 April 2023 - 08 May 2023
Public consultation on the “Rules for suspension and restoration of market activities” and the “Rules for settlement in case of suspension of market activities”
-
27 March 2023 - 27 April 2023
Innovation strategy as part of the incentive to promote innovation for the regulatory period 2024-2027
-
10 March 2023 - 10 April 2023
Public consultation on the proposal of review of the Terms and Conditions applicable to providers of restoration service (T&C RSP) and Procurement process for Restoration Services
-
24 February 2023 - 26 March 2023
Public consultation on a proposal for amendment to Elia’s LFC block operational agreement
-
14 February 2023 - 20 March 2023
Key elements of foreseen evolutions included in the tariff proposal 2024-2027
-
06 February 2023 - 06 March 2023
Formal public consultation on the CRM and LCT Capacity Contract
-
13 January 2023 - 10 February 2023
Formal public consultation on the Functioning Rules for the tender for low carbon capacities
-
27 January 2023 - 06 February 2023
ELIA answer to CREG public consultation from 05/01 to 06/02 on draft decision (B)2947 regarding modifications in the T&C BRP by the CREG
-
19 December 2022 - 20 January 2023
Public Consultation on the Design Note Consumer Centric Market Design
-
02 November 2022 - 16 January 2023
Federal Development Plan for the Belgian transmission system (110 kV to 380 kV) over the period 2024-2034
-
25 November 2022 - 04 January 2023
Formal public consultation on the CRM Functioning Rules
-
28 October 2022 - 28 November 2022
Public consultation on the methodology, the basis data and scenarios used for the study regarding the adequacy and flexibility needs of the Belgian power system for the period 2024-2034 and including also the scenario parameters for the "Low Carbon Tender" 2024-25
-
20 October 2022 - 20 November 2022
Public consultation on the study on aFRR activation method
-
20 October 2022 - 20 November 2022
Public consultation on an analysis of the possibility to offer different types of balancing products and/or to combine the offer of balancing products (FCR/aFRR/mFRR) with the supply of energy in the DA/ID market through ToE on a same delivery point DPpg
-
14 October 2022 - 04 November 2022
Public consultation on the Low Carbon Tender design note
-
15 September 2022 - 13 October 2022
Public consultation on the study on procurement strategies for a dynamic calculation of FRR means
-
15 September 2022 - 13 October 2022
Public consultation of the study on the evolution of the BRP nominations
-
20 September 2022 - 11 October 2022
Public consultation on a modification of the methodology to determine the balancing capacity in the Elia LFC block
-
01 July 2022 - 31 August 2022
Investment plan Flemish Region 2022 - 2032
-
10 June 2022 - 15 July 2022
Public consultation on the improvement of the quality of input data for congestion management in the framework of a CREG incentive
-
16 May 2022 - 16 June 2022
Public consultation on a proposal for amendment to Elia’s LFC block operational agreement
-
06 May 2022 - 06 June 2022
Public consultation on the scenarios, sensitivities and data for the CRM parameter calculation for the Y-4 Auction for Delivery Period 2027-2028
-
03 May 2022 - 31 May 2022
Public consultation on a proposal to update the Access Rules of Nemo Link
-
29 April 2022 - 30 May 2022
Public consultation on the Analysis and implementation of the FCR evolutions in accordance to article 154(2) of SOGL
-
11 March 2022 - 10 April 2022
Formal public consultation on the CRM Capacity Contract
-
11 February 2022 - 13 March 2022
Public consultation regarding the revision of the Access Contract
-
23 December 2021 - 02 February 2022
Public consultation on the market functioning rules for the compensation of quarter-hour imbalances (“Balancing Rules”)
-
08 December 2021 - 18 January 2022
Public consultation on the proposal for amendment of the T&C BSP aFRR
-
26 November 2021 - 04 January 2022
Formal public consultation on the CRM Functioning Rules